Highway Work Zones in the VDOT Staunton District
STAUNTON – The following is a list of highway work that may affect traffic in the Staunton transportation district during the coming weeks. The Staunton District consists of 11 counties from the Alleghany Highlands to the northern Shenandoah Valley: Alleghany, Bath, Rockbridge, Highland, Augusta, Rockingham, Page, Shenandoah, Frederick, Clarke and Warren.
Scheduled work is subject to change due to inclement weather and material supplies. Motorists are advised to watch for slow-moving tractors during mowing operations. When traveling through a work zone, be alert to periodic changes in traffic patterns and lane closures.
*NEW* or *UPDATE* indicates a new or revised entry since last week’s report.
ALLEGHANY COUNTY
INTERSTATE 64
*NEW* Mile marker 0 to 41, eastbound and westbound – Overnight alternating lane closures for vegetation management, 7 p.m. to 7 a.m. on nights Monday through Thursday.
Mile marker 35 to 41, eastbound – Alternating lane closures for paving operations, 6 a.m. to 7 p.m. through May 31.
PRIMARY ROADS
Various roads – Flagger traffic control for tree and debris removal, drainage work, pothole patching, brush cutting, ditching and shoulder repairs, 7:30 a.m. to 3 p.m. on weekdays.
SECONDARY ROADS
Various roads – Flagger traffic control for ditch work, pipe replacement and brush cutting, 7:30 a.m. to 3 p.m. on weekdays.
BATH COUNTY
PRIMARY ROADS
Various roads – Flagger traffic control for shoulder repairs and pipe cleaning, 7:30 a.m. to 3 p.m. on weekdays.
SECONDARY ROADS
Various roads – Flagger traffic control for brush cutting and pipe cleaning, 7:30 a.m. to 3 p.m. on weekdays.
ROCKBRIDGE COUNTY
INTERSTATE 64
*NEW* Mile marker 41 to 57, eastbound and westbound – Overnight alternating lane closures for vegetation management, 7 p.m. to 7 a.m. on nights Monday through Thursday.
Mile marker 44 to 49, eastbound – Alternating lane closures for paving operations, 6 a.m. to 8 p.m. through Friday.
INTERSTATE 81
*NEW* Mile marker 174 to 205, northbound and southbound – Overnight alternating lane closures for vegetation management, 7 p.m. to 7 a.m. on nights Monday through Thursday.
*UPDATE* Mile marker 174 to 188, northbound and southbound – Shoulder closures for ditch cleaning operations, 7 a.m. to 5 p.m. Monday through Friday.
PRIMARY ROADS
*NEW* Route 60 (East Midland Trail) – Eastbound alternating lane closures between southbound I-81 on-ramp and Route 699 (Wesley Chapel Road) for overhead sign repairs, 8 a.m. to 5 p.m. Monday and Tuesday.
Various roads – Flagger traffic control for pipe replacement, ditch work, tree removal, shoulder repairs, pavement patching and brush cutting. Mobile lane closures for mowing, 7:30 to 3 p.m. on weekdays.
SECONDARY ROADS
Route 712 (Wades Road) – Road closed to through traffic between Route 726 (McElwee Road) and Route 729 (Back Draft Road) for replacement of bridge over Cedar Grove Branch, through May 16. Follow posted detour.
Various roads – Flagger traffic control for grading, pipe replacement, ditch work, tree removal, pavement patching, shoulder repairs and brush cutting. Mobile lane closures for mowing, 7:30 a.m. to 3 p.m. on weekdays.
HIGHLAND COUNTY
PRIMARY ROADS
Various roads – Flagger traffic control for pothole patching, brush cutting and shoulder repairs, 7:30 a.m. to 3 p.m. on weekdays.
SECONDARY ROADS
Various roads – Flagger traffic control for brush cutting, pipe cleaning, tree removal, adding stone to unpaved roads and ditch work, 7:30 a.m. to 3 p.m. on weekdays.
AUGUSTA COUNTY
INTERSTATE 64
*UPDATE* Mile marker 87 to 96, eastbound and westbound – Shoulder closures for pipe repairs, 7 a.m. to 5:30 p.m. Monday through Thursday.
*NEW* Mile marker 90 to 88, westbound – Overnight alternating lane closures for overhead sign repairs, 8 p.m. to 4 a.m. Wednesday night.
*UPDATE* Mile marker 95 to 96, eastbound – Right shoulder closures for sign installation work, 9 a.m. to 3 p.m. Monday through Thursday.
*UPDATE* Mile marker 96 to 100, eastbound – Overnight left lane closures for traffic equipment installation, 7 p.m. to 5:30 a.m. Monday through Thursday nights.
INTERSTATE 81
*UPDATE* Mile marker 205 to 214, northbound and southbound – Shoulder closures for pipe work and shoulder repairs, 7 a.m. to 5:30 p.m. Monday through Thursday.
*NEW* Mile marker 214 to 213, southbound – Overnight alternating lane closures for maintenance to bridge over Route 11, 8 p.m. to 6 a.m. through Thursday night.
Mile marker 214 to 210, southbound – Alternating lane closures for milling and paving operations, 8 p.m. to 7 a.m. nights through July 25. Exit 213 traffic will be detoured during ramp paving.
Mile marker 220 to 222, northbound and southbound – Left and right shoulder closures for bridge work, 24/7 through September 30.
Mile marker 219 to 223, northbound and southbound – Overnight alternating lane closures for bridge maintenance, 8 p.m. to 9 a.m. through night of May 9.
*UPDATE* Mile marker 221 to 226, northbound and southbound – Overnight left lane closures for installation of concrete barriers, 8 p.m. to 7 a.m. nights through May 10. Following barrier placement, left shoulder closures remain in place 24/7 through spring 2026. Work is related to I-81 widening project.
PRIMARY ROADS
Route 11 (Lee Highway) – Northbound right lane closures between Route 940 (Dick Huff Lane) and Staunton city limits for sidewalk installation, 7 a.m. to 5:30 p.m. through May 24.
Route 262 (Woodrow Wilson Parkway) – Eastbound and westbound left shoulder closures due to widening project in the area of the Route 252 (Middlebrook Avenue) interchange, 7:30 a.m. to 4:30 a.m. through May 25.
SECONDARY ROADS
Route 612 (Laurel Hill Road) – Westbound right lane and shoulder closures between Route 818 (Dunsmore Road) and Route 1906 (Lodge Lane) for milling at various entrances, 7 a.m. to 5:30 p.m. through May 27. Work related to Verona pedestrian improvement project.
Route 624 (South Delphine Avenue, Waynesboro) – Shoulder closures between South Oak Lane and Chinquapin Drive for work related to construction of Waynesboro Southern Corridor, through May 30, 2025.
Route 635 (Barterbrook Road) – Closed between I-81 frontage roads (FR-217 and FR-218) for bridge replacement as part of I-81 southbound auxiliary lane project. Follow posted detour. Expected completion summer 2025.
Route 664 (Lyndhurst Road, Waynesboro) – Shoulder closures between Miami Avenue and Purdue Street for work related to construction of Waynesboro Southern Corridor, through June 30, 2025.
Route 675 (Broadhead School Road) – Flagger traffic control between Route 11 (Lee Jackson Highway) and Route 604 (McClures Mill Road) for utility work, 9 a.m. to 2:30 p.m. through Thursday.
Route 707 (Trimbles Mill Road) – Flagger traffic control between Route 806 (Boy Scout Lane) and Route 713 (Shuey Road) for utility work, 9 a.m. to 2:30 p.m. through Thursday.
Route 708 (Glebe School Road) – Closed to through traffic between Route 711 (Miller Farm Road) and Route 710 (Eidson Creek Road) for maintenance to bridge over Eidson Creek, through May 16. Follow posted detour.
*UPDATE* Route 876 (Glebe School Road) – Flagger traffic control between Route 713 (Shuey Road) and Route 602 (Summerdean Road) for utility work, 8 a.m. to 5 p.m. through May 16.
Various roads – Mobile traffic control for mowing operations. Flagger traffic control for drainage work, tree removal, shoulder repairs, pavement patching and brush cutting, 7:30 to 3 p.m. on weekdays.
ROCKINGHAM COUNTY
INTERSTATE 81
Mile marker 237 to 263, northbound and southbound – Shoulder closures in various locations for drainage work, 7 a.m. to 5:30 p.m. through Friday.
Mile marker 242 to 248, northbound and southbound – Overnight alternating lane closures as needed, 8 p.m. to 7 a.m. through December 2026. Overnight slow-roll closures as needed, 11 p.m. to 5 a.m. Expect delays. Traffic restrictions are related to Route 33 bridge and interchange project.
Mile marker 244 to 249, northbound and southbound – Right shoulder closures for rock and soil testing, 8 a.m. to 5:30 p.m. through Friday.
PRIMARY ROADS
Route 33 (Spotswood Trail) – Eastbound and westbound alternating lane closures near Elkton town limits for maintenance to bridge over Route 340, 7 a.m. to 6 p.m. through Friday.
Route 33 (East Market Street, Harrisonburg) –Eastbound and westbound alternating lane closures and traffic lane shifts between Vine Street/Hawkins Street and University Boulevard for bridge and roadway work. Work zone speed limit 25 miles an hour with automated speed enforcement. Traffic restrictions are for Route 33 bridge replacements and interchange improvement through fall 2026.
Route 33 (Rawley Pike) – Flagger and pilot-truck traffic control between Dry Run Road and Switzer Lake Road for road widening project, 7:30 a.m. to 5 p.m. through August 30.
Route 259 (Lee Street/Brocks Gap Road) – Flagger traffic control between Broadway town limits and Route 1411 (Shenandoah Avenue) for utility work, 7 a.m. to 8 p.m. through June 28.
Various roads – Mobile traffic control for mowing operations. Flagger traffic control for pipe replacement, ditch work, tree removal, shoulder repairs, pavement patching and brush cutting, 7:30 a.m. to 3 p.m. on weekdays.
SECONDARY ROADS
Route 604 (Loop Road) – Closed to through traffic between Route 609 (Naked Creek Road) and Route 750 (Kemble Spring Lane, Page County) for replacement of bridge over Naked Creek, through June 7. Follow posted detour.
PAGE COUNTY
PRIMARY ROADS
*UPDATE* Route 211 – Single-lane closures between Route 340 South and Shenandoah County line for re-seeding operations, 7 a.m. to 4:30 p.m. weekdays through Tuesday.
Various roads – Mobile traffic control for mowing operations. Flagger traffic control for pipe replacement, ditch work, tree removal, shoulder repairs, pavement patching and brush cutting, 7:30 a.m. to 3 p.m. on weekdays.
SECONDARY ROADS
Route 604 (Loop Road) – Closed to through traffic between Route 609 (Naked Creek Road) and Route 750 (Kemble Spring Lane) for replacement of bridge over Naked Creek, through June 7. Follow posted detour.
Various roads – Flagger traffic control for brush cutting and pipe cleaning, 7:30 a.m. to 3 p.m. on weekdays.
SHENANDOAH COUNTY
INTERSTATE 81
Mile marker 298 to 264, southbound – Right shoulder closures for ditch cleaning operations, 8 a.m. to 3 p.m. Monday through Saturday.
Mile marker 296 to 299, northbound and southbound – Right shoulder closures including along Exit 298 off-ramp for utility installation, 7:30 a.m. to 5:30 p.m. through June 3.
PRIMARY ROADS
*NEW* Route 11 (Main Street, Woodstock) – Southbound right shoulder closures between Woodstock town limits and Route 605 (Hoover Road) for sign work, 8 a.m. to 5 p.m. Monday through Friday.
Route 11 (Old Valley Pike) – Right shoulder closures along on-ramp to southbound I-81 at exit 298 for utility work, 7:30 a.m. to 5:30 p.m. through Friday.
Route 55 (John Marshall Highway) – Westbound right shoulder closures in the area of I-81 at exit 296 for utility work, 7:30 a.m. to 7 p.m. through June 3.
SECONDARY ROADS
No lane closures reported.
FREDERICK COUNTY
INTERSTATE 81
Mile marker 300 to 301, northbound and southbound – Overnight lane closures and traffic-lane shifts as needed, 8 p.m. to 7 a.m. through December 2024. Shoulder closures 24/7. Work zone speed limit 55 miles an hour. Work is related to southbound acceleration ramp extension and bridge widening with estimated completion in late 2024.
*UPDATE* Mile marker 302 to 313, northbound and southbound – Right shoulder closures for shoulder repairs and brush removal, 8 a.m. to 3 p.m. through Saturday.
Mile marker 317 to 319, northbound and southbound – Overnight alternating lane closures for maintenance to bridges over railway, 8 p.m. to 6 a.m. nights through Thursday.
PRIMARY ROADS
*NEW* Route 11 (Valley Pike) – Northbound and southbound single lane closures between Barley Drive and Route 649 (Springdale Road) for utility work, 9 a.m. to 3 p.m. Monday through Friday.
*NEW* Route 11 (Martinsburg Pike) – Northbound and southbound right shoulder closures between Route 661/839 (Welltown Road/Amoco Lane) and Route 838 (McCanns Road) for signal installation, 7 a.m. to 5 p.m. Tuesday through Thursday.
*UPDATE* Route 522 (North Frederick Pike) – Southbound right lane closures between Whitetail Lane and Route 705 (North Ebenezer Church Road) for utility work, 8 a.m. to 5:30 p.m. Monday and Tuesday.
*UPDATE* Various roads – Mobile traffic control for pavement marking on parts of Route 7 (Berryville Pike), Route 11 (Martinsburg Pike), Route 50 (Millwood Pike/Northwestern Pike) and Route 522 (Front Royal Pike/North Frederick Pike), 8 a.m. to 5 p.m. through May 8.
SECONDARY ROADS
Route 661 (Redbud Road) – Flagger traffic control between Route 662 (Milburn Road) and Route 660 (Woods Mill Road) for road maintenance, 9 a.m. to 3:30 p.m. through December 31.
Route 662 (Milburn Road) – Flagger traffic control between Route 661 (Redbud Road) and Route 761 (Old Charles Town Road) for road maintenance, 9 a.m. to 3:30 p.m. through December 31.
*NEW* Route 1322 (Brooke Road) – Flagger traffic control near intersection with West Brooke Road for utility work, 7:30 a.m. to 4 p.m. May 5 – May 13.
CLARKE COUNTY
PRIMARY ROADS
No lane closures reported.
SECONDARY ROADS
No lane closures reported.
WARREN COUNTY
INTERSTATE 66
*NEW* Mile marker 0 to 8, eastbound and westbound – Right shoulder closures for litter pickup operations, 12 noon to 3 p.m. Wednesday.
*UPDATE* Mile marker 9 to 7, westbound – Overnight right lane closures at Shenandoah River bridge for utility work, 8 p.m. to 5 a.m. through night of May 9.
INTERSTATE 81
*NEW* Mile marker 299 to 300, northbound – Overnight alternating lane closures for overhead sign repairs, 8 p.m. to 4 a.m. Thursday night.
*NEW* Mile marker 299 to 300, northbound – Right shoulder closures for utility work, 7:30 a.m. to 7 p.m. through May 31.
Mile marker 299 to 300, northbound and southbound –Overnight lane closures and traffic-lane shifts as needed, 8 p.m. to 7 a.m. through December 2024. Shoulder closures 24/7. Work zone speed limit 55 miles an hour. Work is related to southbound acceleration ramp extension and bridge widening with estimated completion in late 2024.
PRIMARY ROADS
No lane closures reported.
SECONDARY ROADS
*NEW* Route 649 (Browntown Road) – Overnight mobile traffic control between Route 613 (Bentonville Road) and Route 340 (Stonewall Jackson Highway) for pavement marking work, 7 p.m. to 7 a.m. Wednesday night.
Route 658 (Rockland Road) – Closed to through traffic between Route 340/522 (Winchester Road) and Route 705 (Fishnet Boulevard) for construction of bridge over Norfolk Southern Railway. Estimated completion December 2025.
Vegetation management may take place district wide on various routes. VDOT reminds motorists to use extreme caution when traveling through work zones.
For updated traffic alerts and traveler information, dial 511 or visit https://www.511virginia.org.
The VDOT Customer Service Center can assist with reporting road hazards, asking transportation questions, or getting information related to Virginia’s roads. Call 800-FOR- ROAD (800-367-7623) or use its mobile friendly website at https://my.vdot.virginia.gov. Agents are available 24 hours-a-day, seven days a week.
The VDOT Staunton District is on Facebook and X (Twitter). Follow VDOT statewide accounts on Facebook, X (Twitter), YouTube, Instagram, LinkedIn and Flickr. The VDOT Web page is located at https://www.vdot.virginia.gov.
(END)
Last updated: November 25, 2024